ADC MM701G User Manual Page 84

  • Download
  • Add to my manuals
  • Print
  • Page
    / 168
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 83
Verify Connectivity
76 MM701G and MM702G User Manual
VERIFY CONNECTIVITY
After you have performed each of the previous configuration changes, verify back-to-back
communication by passing traffic over the WAN session. For example, set up a PC on the
LAN-side of the Remote modem and another PC on the LAN-side of the Central-Office modem.
Then, transfer a file or ping between the two PCs. This generates traffic and tests connectivity.
1 On the front panel of one of the modems, check the status of the SYNC LED. If it is
blinking, it is attempting to establish communication with the other modem. If it is on solid
green, it has already synchronized its connection with the other modem. See “LED Status
Indications” on page 5 for further definitions of LEDs indications.
2 Select
System on the menu bar, then select ATM Statistics under [Status] to access the ATM
Statistics
page.
3 View the statistics. If the RX Cell and TX Cell values increment, the two modems have
established communication and are passing traffic. If they do not, refresh the page by
clicking the
Refresh button on your Web browser. If the counters still do not increment,
verify each modem for the correct configuration parameters.
Page view 83
1 2 ... 79 80 81 82 83 84 85 86 87 88 89 ... 167 168

Comments to this Manuals

No comments